Further developments to the hydrothermal scheduling model MHE

A. Ramos J.M. Latorre

February 2019 - December 2019

Funding entity Iberdrola Generación España, S.A.U


In this project we have introduced a set of developments that allow to speed up the model runs for numerous and varied hydro scenarios, and at the same time being accurate enough in representing the system operation under the current conditions. Among them they are: i) run time reduction, ii) change from week to moon month, iii) peaking of hydro production, iv) adaptation of MHE results to simulador, v) exchanges with France.